Anaging Department£º
All activities concerning quality control
are managed by the Quality Assurance and Calibration Department
with 7 test stations, 1 calibration center and 1 type test
lab.
|
Engineering
personnel:£º
There are 100 engineering staffs working in the QAC Department,
among whom 5 are engineers, 6 are engineer-assistants and 29
are technicans. |
Quality
System£º
A Quality System was established in accordance with ISO9001
in 1992. Over the past decade or more, the QS has been improved
and developed continuously and operating efficiently. Voer all
process control has been realized from the phase of product
design to material purchasing, on-line production, sales and
follow up service. Scientification, programmatication, documentalizstion,
digitalization and intelligentialization have been realized
in the fields of product digitalization and intelligentialization
have been realized in the fields of product research and development,
purchase management, production processes, quality control and
sales. |
Recognition
Certificates Obtained£º
1¡¢ ISO9001-94£¨08/1995£©£»ISO9001-2000(11/2001)
2¡¢ ISO9001-FMRC£¨08/1995£©
3¡¢ISO90012-1(01/1998)
4¡¢CCEE£¨05/1992£©£»3C(CQRC)(05/2002)
5¡¢UL listed products (from 09/1994): close to 40 models. |
|
|